CASE STUDIES
FPSO Guanabara
![](https://brasilamarras.com/wp-content/uploads/2021/08/case-studies-fpso-guanabara.jpg)
The FPSO Guanabara will be installed in the Mero field, belonging to the Libra block in the Santos Basin pre-salt area, with processing capacity of 180,000 barrels of oil per day.
![](https://brasilamarras.com/wp-content/uploads/2021/08/storage-150x150.png)
Storage
1,400,000 BBLS
![oil production](https://brasilamarras.com/wp-content/uploads/2021/08/oil-pump-150x150.png)
Oil Production
180,000 bopd
![gas production](https://brasilamarras.com/wp-content/uploads/2021/08/gas-storage-150x150.png)
Gas Production
424 mmscfd
![water producer](https://brasilamarras.com/wp-content/uploads/2021/08/water-pump-150x150.png)
Produced Water
225,000 bwpd
![](https://brasilamarras.com/wp-content/uploads/2021/08/equipo-150x150.png)
Duty Holder
Petrobras
![camp location](https://brasilamarras.com/wp-content/uploads/2021/08/pin-150x150.png)
Field location
Mero
![](https://brasilamarras.com/wp-content/uploads/2021/08/mooring-type-150x150.png)
Mooring Type
SOFEC Spread Mooring
![](https://brasilamarras.com/wp-content/uploads/2021/08/water-depth-150x150.png)
Water Depth
2,100 m
If you need further information about this project, please fill the form below to get in contact with us. We will reply as soon as possible.